MapLink™ | Procedures | Stormwater Control in Areas of Medford Township under the jurisdiction of the Pinelands Commission

Hello! Content on this website is provided as a convenience and is for informational use only. Be sure to review the Terms of Use for all of the details related to your use of this website.
Accept
Back
Stormwater Control in Areas of Medford Township under the jurisdiction of the Pinelands Commission
Stormwater Management Requirements.
 
Any application for a new agricultural development that meets the definition of major development at N.J.A.C. 7:8-1.2 shall be submitted to the Soil Conservation District for review and approval in accordance with the requirements at § DR-509.2C.14, § DR-509.2C.15, § DR-509.2C.16, and § DR-509.2C.17 and any applicable Soil Conservation District guidelines for stormwater runoff quantity and erosion control. For purposes of this subsection, "agricultural development" means land uses normally associated with the production of food, fiber, and livestock for sale. Such uses do not include the development of land for the processing or sale of food and the manufacture of agriculturally related products.

If there is more than one drainage area, the groundwater recharge, stormwater runoff quality, and stormwater runoff quantity standards at § DR-509.2C.15, § DR-509.2C.16, and § DR-509.2C.17 shall be met in each drainage area, unless the runoff from the drainage areas converge onsite and no adverse environmental impact would occur as a result of compliance with any one or more of the individual standards being determined utilizing a weighted average of the results achieved for that individual standard across the affected drainage areas.

Any stormwater management measure authorized under the municipal stormwater management plan or this section shall be reflected in a deed notice recorded in the Burlington County Clerk's Office. A form of deed notice shall be submitted to the municipality for approval prior to filing. The deed notice shall contain a description of the stormwater management measure(s) used to meet the green infrastructure, groundwater recharge, stormwater runoff quality, and stormwater runoff quantity standards at § DR-509.2C.14, § DR-509.2C.15, § DR-509.2C.16, and § DR-509.2C.17 and shall identify the location of the stormwater management measure(s) in NAD 1983 State Plane New Jersey FIPS 2900 US Feet or Latitude and Longitude in decimal degrees. The deed notice shall also reference the maintenance plan required to be recorded upon the deed pursuant to § DR-509.2I.2.e. Prior to the commencement of construction, proof that the above required deed notice has been filed shall be submitted to the municipality. Proof that the required information has been recorded on the deed shall be in the form of either a copy of the complete recorded document or a receipt from the clerk or other proof of recordation provided by the recording office. However, if the initial proof provided to the municipality is not a copy of the complete recorded document, a copy of the complete recorded document shall be provided to the municipality within 180 calendar days of the authorization granted by the municipality.

A stormwater management measure approved under the municipal stormwater management plan or this section may be altered or replaced with the approval of the municipality, if the municipality determines that the proposed alteration or replacement meets the design and performance standards contained in § DR-509.2C.15, § DR-509.2C.16, and § DR-509.2C.17 and provides the same level of stormwater management as the previously approved stormwater management measure that is being altered or replaced. If an alteration or replacement is approved, a revised deed notice shall be submitted to the municipality for approval and subsequently recorded with the Burlington County Clerk's Office and shall contain a description and location of the stormwater management measure, as well as reference to the maintenance plan, in accordance with the subsection above. Prior to the commencement of construction, proof that the above required deed notice has been filed shall be submitted to the municipality in accordance with the subsection above.

As-built requirements for major development are as follows:
a. After all construction activities have been completed on the parcel and finished grade has been established in each stormwater management measure designed to infiltrate stormwater, replicate post-development permeability tests shall be conducted to determine if as-built soil permeability rates are consistent with design permeability rates. The results of such tests shall be submitted to the municipal engineer or other appropriate reviewing engineer. If the results of the post-development permeability tests fail to achieve the minimum required design permeability rate, utilizing a factor of safety of two, the stormwater management measure shall be renovated and re-tested until the required permeability rates are achieved; and

b. After all construction activities and required testing have been completed on the parcel, as-built plans, including as-built elevations of all stormwater management measures shall be submitted to the municipal engineer or other appropriate reviewing engineer to serve as a document of record. Based upon that engineer's review of the as-built plans, all corrections or remedial actions deemed necessary due to the failure to comply with design standards and/or for any reason concerning public health or safety, shall be completed by the applicant. In lieu of review by the municipal engineer, the municipality may engage a licensed professional engineer to review the as-built plans and charge the applicant for all costs associated with such review.

Requirements for a site development stormwater plan.
1. Submission of site development stormwater plan. See § DR-509.2H.1 for detailed information.

2. Site development stormwater plan Approval. The site development stormwater plan shall be reviewed as a part of the development review process by the municipal board or official from whom municipal approval is sought. That municipal board or official shall consult the engineer retained by the Planning and/or Zoning Board (as appropriate) to determine if all the checklist requirements have been satisfied and to determine if the project meets the standards set forth in this section.

3. Checklist Requirements for major development. See § DR-509.2H.3 for a list of requirements.
4. Checklist Requirements for minor development. See § DR-509.2H.4 for alist of requirements.
5. Exception from Submission Requirements. See § DR-509.2H.5 for details.

Maintenance and Repair.
1. All development regulated under this section shall incorporate a maintenance plan, prepared by the design engineer, consistent with Subsection 2 below. Maintenance and repair shall be implemented in accordance with maintenance plan and Subsection 3 below.

2. The maintenance plan shall include the following: see § DR-509.2I.2 for details.
3. General Maintenance and Repair.
a. Preventative and corrective maintenance shall be performed to maintain the function of the stormwater management measure, including, but not limited to, repairs or replacement to the structure; removal of sediment, debris, or trash; restoration of eroded areas; snow and ice removal; fence repair or replacement; restoration of vegetation; and repair or replacement of non-vegetated linings.

b. The person responsible for maintenance identified under § DR-509.2I.2.b shall perform all of the following requirements:
(1) Maintain a detailed log of all preventative and corrective maintenance for the structural stormwater management measures incorporated into the design of the development, including a record of all inspections and copies of all maintenance-related work orders;

(2) Evaluate the effectiveness of the maintenance plan at least once per year and adjust the plan and the deed as needed; and

(3) Retain and make available, upon request by any public entity with administrative, health, environmental, or safety authority over the site, the maintenance plan and the documentation required by Subsection b.(1) and (2) above.

c. The requirements of Subsection I.2.b, c, and d above do not apply to stormwater management facilities that are dedicated to and accepted by the municipality or another governmental agency, subject to all applicable municipal stormwater general permit conditions, as issued by the Department.

d. In the event that the stormwater management facility becomes a danger to public safety or public health, or if it is in need of maintenance or repair, the municipality shall so notify the responsible person in writing. Upon receipt of that notice, the responsible person shall have 14 days to effect maintenance and repair of the facility in a manner that is approved by the municipal engineer or his designee. The municipality, in its discretion, may extend the time allowed for effecting maintenance and repair for good cause. If the responsible person fails or refuses to perform such maintenance and repair, the municipality or County may immediately proceed to do so and shall bill the cost thereof to the responsible person. Nonpayment of such bill may result in a lien on the property.
 
4. Nothing in this section shall preclude the municipality in which the major development is located from requiring the posting of a performance or maintenance guarantee in accordance with N.J.S.A. 40:55D-53.
 
Variances. See § DR-509.2J for detailed information. 
 
Penalties. Any person(s) who erects, constructs, alters, repairs, converts, maintains, or uses any building, structure or land in violation of this section shall be subject to the penalties for a violation of the DR Development Regulations, § 1004: Penalties.

See § 509.2: Stormwater Control in Areas of Medford Township under the jurisdiction of the Pinelands Commission for more detailed information.